About project

Installation of biomass boiler houses with a thermal capacity of 60MW.
– Reconstruction of the wet ash removal system, including two conveyors, a hydraulic gate shut-off valve system, automation, construction works and other auxiliary systems.
– Design, manufacturing and installation.